Part-5 Software Requirement Specifications (SRS) | Software Engineering MCQs(Multiple Choice Questions Highlights) Questions | PDF | Quiz To test your Knowledge 1000 MCQs | Geekforgeeks.in


60. Which of the following is not included in SRS?

a. Performance

b. Functionality

c. Design solutions

d. External Interfaces

Answer: Option (c)

61. The main goal of arriving at a final

specification is _____?

a. To compute the cost of implementing the

system

b. To assist in designing the system

c. To tell the organization’s managers how

the system will function

d. To tell the organization’s managers

what the proposed system will achieve

in a language understood by them

Answer: Option (d)



62. Final specifications are drawn up by _____?

a. System designers along with users

b. The managers of user organization

c. System analyst in consultation with

programmers

d. System analyst in consultation with the

management of the organization

Answer: Option (d)



63. The role of a system analyst drawing up a

requirements specification is similar to _____?

a. Architect designing a building

b. A structural engineer designing a building

c. A contractor constructing a building

d. The workers who construct a building

Answer: Option (a)



64. Which one from the following is highly

associated activity of project planning?

a. Keep track of the project

b. Compare actual and planned progress and

costs

c. Identify the activities, milestones and

deliverables produced by a project

d. Both B and C

Answer: Option (c)



65. The final specifications are arrived at _____?

a. During feasibility study

b. After feasibility study

c. Just before implementation phase

d. When the system is being designed

Answer: Option (b)



66. Arrange the given sequence to form a SRS

prototype outline as per SRS standard.

i). General description

ii). Introduction

iii). Review

iv). Appendices

v). Specific Requirements

a. iii, i, ii,v, iv

b. iii, ii, i, v, iv

c. ii, i, v, iv, iii

d. iii, i, ii,v,iv

Answer: Option (c)



67. Requirement prioritization and negotiation

belongs to _____?

a. Feasibility study

b. Requirement elicitation

c. Requirement validation

d. Requirements reviews

Answer: Option (b)



68. System approval criteria are specified _____?

a. During feasibility study

b. During the requirements specifications

stage

c. During system study stage

d. When the final specifications are drawn

up

Answer: Option (d)



69. Which of the following is used to determine the

specificity of requirements? Where n1 is the

number of requirements for which all reviewers

have identical interpretations, n2 is number of

requirements in a specification.

a. n1/n2

b. n2/n1

c. n1+n2

d. n1n2

Answer: Option (a)



70. Requirementmanalysis is critical to the success

of a development project.

a. True

b. False

c. Depends upon the size of project

d. None of the mentioned

Answer: Option (a)



71. How many feasibility studies is conducted in

Requirement Analysis?

a. Two

b. Three

c. Four

d. None of the mentioned

Answer: Option (b)



72. The statement “Conformity to a standard is

maintained” depicts _____________ property

of SRS.

a. Correct

b. Complete

c. Consistent

d. Modifiable

Answer: Option (b)



73. The SRS is said to be consistent if and only if

a. its structure and style are such that any

changes to the requirements can be made

easily while retaining the style and

structure

b. every requirement stated therein is one

that the software shall meet

c. every requirement stated therein is

verifiable

d. no subset of individual requirements

described in it conflict with each other

Answer: Option (d)



74. The SRS document is also known as

_____________ specification.

a. black-box

b. white-box

c. grey-box

d. none of the mentioned

Answer: Option (a)



75. The dynamic behaviour of the system is

represented by which model?

a. Context Model

b. Behavioral Model

c. Data Model

d. Object Model

Answer: Option (b)


Post a Comment

0 Comments