76.
Which aspect in system modelling shows the
system
or data architecture.
a. Structural aspect
b.
Behavioral aspect
c.
External aspect
d.
All of the mentioned
Answer:
Option (a)
77.
Which of the following statement is incorrect
regarding
the Class-responsibility-collaborator
(CRC) modeling ?
a.
All use-case scenarios (and corresponding
use-case
diagrams) are organized into
categories
in CRC modelling
b.
The review leader reads the use-case
deliberately
c.
Only developers in the review (of the
CRC
model) are given a subset of the
CRC
model index cards
d.
All of the mentioned
Answer:
Option (c)
78.
Quality Management in software engineering is
also
known as __________.
a.
SQA
b.
SQM
c.
SQI
d.
SQA and SQM
Answer:
Option (a)
79.
Quality in software can be looked at in terms of
user
satisfaction which includes
a.
A compliant product
b.
Good quality output
c.
Delivery within budget and schedule
d.
All of the mentioned
Answer:
Option (d)
80.
Inspections and testing are __________ kinds
of
Quality Costs.
a.
Prevention
b.
Internal Failure
c.
External Failure
d.
Appraisal
Answer:Option
(d)
81.
According to Pareto’s principle, __________%
of
defects can be traced to __________% of all
causes.
a.
60, 40
b.
70, 30
c.
80, 20
d.
No such principle exists
Answer:
Option (c)
82.
Quality Management includes __________ .
a.
Defining procedures and standards
b.
Checking that procedures are followed
c.
Collecting and analyzing various quality
data
d.
All of the above mentioned
Answer:
Option (d)
83.
Non-conformance to software requirements is
known
as __________ .
a.
Software availability
b.
Software reliability
c.
Software failure
d.
None of the mentioned
Answer:
Option (c)
84.
Software safety is equivalent to software
reliability.
a.
TRUE
b.
FALSE
Answer:
Option (b)
85.
Misinterpretation of customer communication is
a sample of possible cause defects.
a.
TRUE
b.
FALSE
Answer:
Option (a)
86.
__________ kind of quality cost is incurred
when
an error is detected in a product prior to
shipment.
a.
Prevention
b.
Internal Failure
c.
External Failure
d.
Appraisal
Answer:
Option (b)
87.
The degree to which the design specifications
are
followed during development is known as
a.
Quality of design
b.
Quality of conformance
c.
Quality of testing
d.
None of the mentioned
Answer:
Option (b)
88.
An informal review may consist of__________.
a.
Casual meeting
b.
Correction
c.
Inspection
d.
Pair programming
Answer:
Option (a)
89.
Which of the following are objectives for FTR?
a.
Allow senior staff members to correct errors
b.
Assess programmer productivity
c.
Determining who introduced an error into a
program
d.
Uncover errors in software work
products
Answer:
Option (d)
90.
__________ is not one of the activities
recommended
to be performed by an
independent
SQA group.
a.
Prepare SQA plan for the project
b.
Review software engineering activities to
verify
process compliance
c.
Report any evidence of noncompliance to
senior
management
d.
Serve as the sole test team for any
software
produced
Answer:
Option (d)
91.
__________ is not a section in the standard for
SQA
plans recommended by IEEE.
a.
Budget
b.
Documentation
c.
Reviews and audits
d.
Test
Answer:
Option (a)
92.
Statistical quality assurance involves
__________.
a.
Using sampling in place of exhaustive
testing
of software
b.
Surveying customers to find out their
opinions
about product quality
c.
Tracing each defect to its underlying
cause,
isolating the "vital few"
causes,
and moving to correct them
d.
Tracing each defect to its underlying
causes
and using the Pareto principle to
correct
each problem found
Answer:
Option (c)
93.
Software safety is a quality assurance activity
that
focuses on hazards that __________.
a.
Affect the reliability of a software
component
b.
May cause an entire system to fail
c. May result from user input errors
d.
Prevent profitable marketing of the final
product
Answer:
Option (b)
94.
Which of the following is not a core step of Six
Sigma?
a.
Define
b.
Control
c.
Measure
d.
Analyse
Answer:
Option (b)
95.
According to ISO 9001, inspection and testing
comes
under which management responsibility?
a.
Process control
b.
Document control
c.
Control of nonconforming products
d.
Servicing
Answer: Option (
0 Comments