Part-6 Software Requirement Specifications (SRS) | Software Engineering MCQs(Multiple Choice Questions Highlights) Questions | PDF | Quiz To test your Knowledge 1000 MCQs | Geekforgeeks.in



76. Which aspect in system modelling shows the

system or data architecture.

a. Structural aspect

b. Behavioral aspect

c. External aspect

d. All of the mentioned

Answer: Option (a)


77. Which of the following statement is incorrect

regarding the Class-responsibility-collaborator

(CRC) modeling ?

a. All use-case scenarios (and corresponding

use-case diagrams) are organized into

categories in CRC modelling

b. The review leader reads the use-case

deliberately

c. Only developers in the review (of the

CRC model) are given a subset of the

CRC model index cards

d. All of the mentioned

Answer: Option (c)



78. Quality Management in software engineering is

also known as __________.

a. SQA

b. SQM

c. SQI

d. SQA and SQM

Answer: Option (a)



79. Quality in software can be looked at in terms of

user satisfaction which includes

a. A compliant product

b. Good quality output

c. Delivery within budget and schedule

d. All of the mentioned

Answer: Option (d)



80. Inspections and testing are __________ kinds

of Quality Costs.

a. Prevention

b. Internal Failure

c. External Failure

d. Appraisal

Answer:Option (d)



81. According to Pareto’s principle, __________%

of defects can be traced to __________% of all

causes.

a. 60, 40

b. 70, 30

c. 80, 20

d. No such principle exists

Answer: Option (c)



82. Quality Management includes __________ .

a. Defining procedures and standards

b. Checking that procedures are followed

c. Collecting and analyzing various quality

data

d. All of the above mentioned

Answer: Option (d)


83. Non-conformance to software requirements is

known as __________ .

a. Software availability

b. Software reliability

c. Software failure

d. None of the mentioned

Answer: Option (c)




84. Software safety is equivalent to software

reliability.

a. TRUE

b. FALSE

Answer: Option (b)



85. Misinterpretation of customer communication is

a sample of possible cause defects.

a. TRUE

b. FALSE

Answer: Option (a)


86. __________ kind of quality cost is incurred

when an error is detected in a product prior to

shipment.

a. Prevention

b. Internal Failure

c. External Failure

d. Appraisal

Answer: Option (b)


87. The degree to which the design specifications

are followed during development is known as

a. Quality of design

b. Quality of conformance

c. Quality of testing

d. None of the mentioned

Answer: Option (b)


88. An informal review may consist of__________.

a. Casual meeting

b. Correction

c. Inspection

d. Pair programming

Answer: Option (a)



89. Which of the following are objectives for FTR?

a. Allow senior staff members to correct errors

b. Assess programmer productivity

c. Determining who introduced an error into a

program

d. Uncover errors in software work

products

Answer: Option (d)


90. __________ is not one of the activities

recommended to be performed by an

independent SQA group.

a. Prepare SQA plan for the project

b. Review software engineering activities to

verify process compliance

c. Report any evidence of noncompliance to

senior management

d. Serve as the sole test team for any

software produced

Answer: Option (d)


91. __________ is not a section in the standard for

SQA plans recommended by IEEE.

a. Budget

b. Documentation

c. Reviews and audits

d. Test

Answer: Option (a)



92. Statistical quality assurance involves

__________.

a. Using sampling in place of exhaustive

testing of software

b. Surveying customers to find out their

opinions about product quality

c. Tracing each defect to its underlying

cause, isolating the "vital few"

causes, and moving to correct them

d. Tracing each defect to its underlying

causes and using the Pareto principle to

correct each problem found

Answer: Option (c)


93. Software safety is a quality assurance activity

that focuses on hazards that __________.

a. Affect the reliability of a software

component

b. May cause an entire system to fail

c. May result from user input errors

d. Prevent profitable marketing of the final

product

Answer: Option (b)



94. Which of the following is not a core step of Six

Sigma?

a. Define

b. Control

c. Measure

d. Analyse

Answer: Option (b)



95. According to ISO 9001, inspection and testing

comes under which management responsibility?

a. Process control

b. Document control

c. Control of nonconforming products

d. Servicing

Answer: Option (


Post a Comment

0 Comments