Part-2 Introduction to Software Engineering MCQs(Multiple Choice Questions Highlights) Questions | PDF | Quiz To test your Knowledge 1000 MCQs | Geekforgeeks.in

 





16. Which of the following is the Characteristics of good software?

a. Transitional

b. Operational

c. Maintenance

d. All of the above

Answer: Option (d)


17. Where there is a need of Software Engineering?

a. For Large Software

b. To reduce Cost

c. Software Quality Management

d. All of the above

Answer: Option (d)



18. The reason for software bugs and failures is due

to____________.

a. Software Developers

b. Software companies

c. Both A and B

d. None of the above

Answer: Option (d)



19. Efficiency in a software product does not include

____

a. Licensing

b. processing time

c. responsiveness

d. memory utilization

Answer: Option (a)



20. What are attributes of good software?

a. Software functionality

b. Software development

c. Software maintainability

d. Both A and C

Answer: Option (d)



21. Build & Fix Model is suitable for programming

exercises of ____LOC (Line of Code).

a. 100-200

b. 200-400

c. 400-1000

d. above 1000

Answer: Option (a)




22. RAD stands for

a. Relative Application Development

b. Rapid Application Development

c. Rapid Application Document

d. None of the mentioned

Answer: Option (b)



23. Which one of the following models is not

suitable for accommodating any change?

a. Build & Fix Model

b. Prototyping Model

c. RAD Model

d. Waterfall Model

Answer: Option (d)



24. Which is not one of the types of prototype of

Prototyping Model?

a. Horizontal Prototype

b. Vertical Prototype

c. Diagonal Prototype

Answer: Option (c)



25. Which one of the following is not a phase of

Prototyping Model?

a. Quick Design

b. Coding

c. Prototype Refinement

d. Engineer Product

e. Domain Prototype.

Answer: Option (b)



26. Which of the following statements regarding

Build & Fix Model is wrong?

a. No room for structured design

b. Code soon becomes unfixable &

unchangeable

c. Maintenance is practically not possible

d. It scales up well to large projects

Answer: Option (d)



27. RAD Model has

a. 2 phases

b. 3 phase

c. 5 phases

d. 6 phases

Answer: Option (c)



28. Which model can be selected if user is involved

in all the phases of SDLC?

a. Waterfall Model

b. Prototyping Model

c. RAD Model

d. both Prototyping Model & RAD Model

Answer: Option (c)




29. Which of the following are valid step in SDLC

framework?

a. Requirement Gathering

b. System Analysis

c. Software Design

d. All of the above

Answer: Option (d)



30. Which of the following is the first step in SDLC

framework?

a. Feasibility Study

b. Requirement Gathering

c. Communication

d. System Analysis

Answer: Option (c)



Post a Comment

0 Comments